Wind turbine installation vessel

主页

>>Interpretation of all engineering documents, project specification, international standard and code.

>> Input completed reporting form of the above into the system

>> Issue NCR (Non Conformance Report) or any other type of defective report

>> Upon receipt of NCR or similar type of report from client, 3r party or authorities, identify and conduct corrective action supervising discipline supervisor or subcontractors

>> Punching and verification of the system punch

>> Regular status reporting of the above works to Module yard QC manager

>> Monitoring of material handling, material, segregation

>> Conducting/monitoring the following;

>> Liaise/assist local government authorities, when requested to do so.

>> Monitor the site traffic control plan.

>> Assist with the coordination of "Emergency Procedures" practice drills.

>> Check all plant/equipment and tool certifications, including Subcontractors "Planned Maintenance Inspection Program" and site color coding requirements.

>> Inspect crane operators "competence certificates" and other vehicle/plant driver’s licenses.

>> Attend the following meetings, (when requested to do so).

>> Investigate/follow-up accidents, incidents and near-miss occurrences and assist with writing reports and issuing corrective measures to prevent recurrence.

>> Oversee site "housekeeping" and the general good appearance of the site, (including welfare facilities).

>> Check the condition of safety signs/posters that are displayed/erected throughout the construction site.

>> Organize/direct safety supervisors under his control, delegating tasks and areas of control.

 



  • Client

    European

  • Service Time

    Feb, 2021- ongoing

  • Standard

    The client's specification

    Inquiry

  • We will reply to you immediately

Tel: +86 0532-83835803

Email: inspection@nuoou-es.com

Copyright © 2019Qingdao nuoou engineering service co. LTD All rights reserved. 鲁ICP备19008905号 Site By:GreatGoal