Pressure vessel(Hydrogen resistant steel composite plate tower)inspection

Client introduction: Petrochem Solutions provides a comprehensive offer including the design and manufacturing of Process Furnaces; Waste heat recovery units as well as process feasibility studies and other services.

We(Nuo Ou) perform whole project quality control and the inspectors on behalf of client to carried out inspection as per client’s ITP.

>> Raw material arriving inspection including goods surface quality, quantity verify and randomly dimensional inspect.

>> Material cutting inspection as per client’s specification.

>> Reviewed WPS and welder ID prior to fabrication.

>> Penetration test process witness for butt weld and welded tee.

>> Pickling and passivation inspection for super duplex pipes after welding.

>> Pressure test process witness for header.

>> Cleanliness and roughness inspection after skid frame sandblasting.

>> Environment condition such as ambient temperature, humidity and dew point while painting.

>> Sandpaper rough inspect for each layer painting and DFT check for primer, intermediate and top coating.

>> Final H point assembly inspection after pressure vessel, header, RO piping, grating, handrail, bracket, ERI and accessory parts installed in according to general arrangement drawing provided by client.

>> Expediting as per client’s progress and coordinate with manufacturer.

>> Daily reports submitted and final MDR review.

 


  • Client

    Petrochem company-French company

  • Service Time

    July,2020~ ongoing

  • Standard

    ASME

    Inquiry

  • We will reply to you immediately

Tel: +86 0532-83835803

Email: inspection@nuoou-es.com

Copyright © 2019Qingdao nuoou engineering service co. LTD All rights reserved. 鲁ICP备19008905号 Site By:GreatGoal