We perform the inspection for iron tower:
>> Raw material arriving inspection including goods surface quality, quantity verify and randomly dimensional inspect.
>> Material cutting inspection as per client’s specification.
>> Reviewed WPS and welder ID prior to fabrication.
>> Fabrication process inspection such as fit-up gap, root face quality of super duplex pipe and welding parameter monitor as per WPS.
>> Randomly visual inspection for welds to verify whether brushed work has been done for each welds layer and tack weld quality.
>> Calibration certificates validity date verify for inspection tools and test meter which to be used while inspection and test.
>> Dimensional inspection including general length, holes distance, diameter for pipes, wall thickness, flange size, flange horizontal and perpendicularity, pipes fit-up angle in according to client’s specification and related standard.
>> Penetration test process witness for butt weld and welded tee.
>> Cleanliness and roughness inspection after skid frame sandblasting.
>> Environment condition such as ambient temperature, humidity and dew point while painting.
>> Sandpaper rough inspect for each layer painting and DFT check for primer, intermediate and top coating.
>> Bolts tightness and torque inspection. Torque reports and alignment reports reviewed as per ITP specified.
>> Packaging inspection and truck loading witness.
>> Expediting as per client’s progress and coordinate with manufacturer.
>> Punch list raised while non conformity issues were detected and push manufacturer to addressed them ASAP.
>> Daily reports submitted and final MDR review.